MWRDGC - Tinley Creek Streambank Stabilization Project
Project Update - Update 3/30/16
This project is being designed, permitted and funded by the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) to reduce and/or eliminate the severe erosion being experienced along two stretches of Tinley Creek from approximately 151st Street south to 159th Street. 

The MWRDGC is currently working to obtain construction and permanent easements for the stabilization project.  Construction will be scheduled when the easements have been procured. 

The design plans are approximately 98% complete and the MWRDGC is working to secure the permit from the United States Army Corps of Engineers. 

As information is made available to the Village, it will be made available to the residents via this website.