A Pre-Pour inspection of the base stone and forms. 24 hour notice is required for all concrete inspections.
Click here for concrete inspection request form. For detailed requirements on sidewalks and driveways –
Land Development Code Section 6-406 – Sidewalks, Driveways, and Parking Lots or
Residential Sidewalk, Patio & Driveway Concrete Requirements Handout.
Due to weather conditions in our region, the Village of Orland Park has a cut off date for exterior concrete flatwork. This period will begin on November 15th and extend to March 15th for flatwork which typically includes driveways, sidewalks, and exposed slabs on grade. For more information on Cold Weather Requirements and Restrictions, please
click here.
Refer to the Village of Orland Park,
Village Code, Title 5, Chapter 1, Section 109.3.7 for Inspection Requirements and Section 109.3.7.1 for Cold Weather Requirements.