Go To Search
Living in Orland ParkEnjoy Orland ParkBusiness and Development
How Do I? - Help Center
Online Services
Click to Home
Driveways
Application Requirements
Permit is required for all work done on driveways concrete or asphalt including but not limited to replacement, widening, and/or installation.

Needed to apply for permit:
  • Completed permit application
  • Legible copy of legal Plat of Survey
  • Dimensions for driveway, before and after change
  • Contractor
  • Cost of work
  • Permit fee of $60


Widths & Lengths
Please view:

Maximum Width
The maximum width for driveways for single family residences including circle drives shall be 20 feet at the building line and 20 feet at the curb; provided, however, that where a two-car or three-car garage is located within 30 feet of the property line, the driveway shall not exceed 26 feet in width at the building line, 26 feet in width at the curb, 36 feet at the building line, or 36 feet at the curb line.

Parkway Encroachment & Length
No driveway shall encroach upon any portion of the parkway in front of the adjoining property. The maximum width for driveways for all other uses shall be as approved by the Board of Trustees upon recommendation of the Department of Engineering. Minimum driveway length is 20 feet, excluding right-of-way and sidewalks.

Weather Restrictions
Due to weather conditions in our region, the Village of Orland Park has a cut-off date for exterior concrete flat work. This period will begin on November 15 and extend to March 15 for flat work which typically includes driveways, sidewalks, and exposed slabs on grade. View more details on cold weather concrete requirements and restrictions.

Refer to Village Code Title 5, Chapter 1, Section 109.3.7 for inspection requirements, and Section 109.3.7.1 for cold weather requirements.

Required Inspections
A pre-pour inspection of the base and forms is required. Requests for inspection need to be made at least 24 hours in advance. Complete an inspection request online. Inspection requests are not taken over the phone.